| Project Name |
Wuyunhe Water Control Project in Jiayin County |
|
Means of Cooperation
|
sole proprietorship, joint venture. |
| Provider |
Development and Reform Bureau of Jiayin County |
| Project Manager |
Liu Jianhua |
| Contact Tel |
0458-2623781 |
| Fax |
0458-2623738 |
| E-mail |
jhjbgs@163.com |
| Postcode |
jhjbgs |
| Project Description |
The planned installed capacity: 25MW, the designed electricity flow: 48 m3/s, the many years鈥?average electricity: 80million kwh. The water blocking engineering project of the hydropower station is 鈪?grade, the total storage capacity is 392million m3. It is a many years鈥?regulating reservoir. The project to be built is a mixed hydropower station; the civil engineering project mainly includes water blocking dam, spillway, pressure tunnel, power workshop, and tail water dyke, etc. |
| Estimated Cost Value |
The engineering quantity of this project鈥檚 principal part is 958,000m3, static total investment USD35.99 million. The capital is to be self-raised. |
| Estimated Profit |
When the hydropower station is built, the flood control standard for the lower reaches will reduce to 5 years from former 20 years, so as to save the many years鈥?average funds for flood control about RMB3.7168million yuan; the annual income from power generation will be RMB31.20million yuan, the annual profit RMB26.40 million yuan. The rate of profit: 10.6%. The investment payback period: 9.4y. |
Raw Material & Product
Market |
|
| Market Prospect |
|
| Market Status |
|
| Raw Material |
|
| Project Progress |
|
| Previous Work |
|
| Construction Scale |
|
| Enterprise Description |
|
|
|
|
|
|
|